Bridge Opening Schedule for Aurora |
Saturday, 20 September 2014 17:54 |
St. Petersburg will see the cruiser "Aurora" travelling down the NevaOn September 21st, the cruiser "Aurora" will leave its spot on the Neva River to go to its repair site further down the Neva. The bridges along the Neva will be open during the morning, which will be a nice sight for spectators of this rare event.The schedule of the bridges is good to know, and in order not to get stuck in a traffic jam: Trinity Bridge - 9.45 - 11.00 Palace Bridge - 9.45 - 11.10 Annunciation Bridge - 9.45 - 11.20 By the way, those citizens who would like to see the exposure of the cruiser will not be disappointed, at the time of repair, the ship will also be temporarily transferred to the Central Naval Museum. Related: |